Haha Permits Morocco

Haha Permits Morocco

  • Sedimentary Basin:Essaouira Basin
  • Area:4919 Km2 (about 25 % of Essaouira Basin)
  • Location:550 km southwest of capital Rabat
  • Working Interest:PEL 37% (operator), FORFETRO: 38% and ONHYM 25% (carried)
  • Play typesStructural/Stratigraphic
  • Hydrocarbon TypeOil, Gas and Condensate
  • Surrounding Oil & gas Fields:Seven Oil and Gas Fields about 60km to the north with estimated reserves of 500 BCF gas and 50 MMBBLO in Triassic & Jurassic sands and carbonates. Sidi Rhalem oil field produced 9 MMBO of oil from Jurassic Carbonates
  • Resource exposure8 TCF Gas and 900 MMBBLO
3D Seismic data acquisition by PEL - 2009

Work Completed

  • Seismic acquired140 km 3D
  • Seismic data reprocessed 07 lines (132 Km)
  • Leads/Prospects mapped10
  • Salt induced surface structures
  • Identified lead size 40-80 km2
  • Petrographic study of Triassic reservoirs
  • Geochemical Modelling
  • Gravity magnetic Data evaluation
  • Tamanar-1 well is suspended.
  • Tamanar-2 well after drilling to a depth of 4306m is currently suspended. Drilling will be resumed in 2018.

  •  

Work in Progress:

  • In-house G & G studies
  • Evaluation of surface structural leads
  • Preparation for drilling of 2nd & 3rd exploratory wells under New Petroleum Agreement

  Haha Permits bordering on Atlantic coastline

Location of Morocco