Milestones Achieved And Key Features:
Petroleum System is fairly present in the region
Recoverable reserves of 124 BCF in Sui Main Limestone
Badar-1 was drilled in 1994. Currently the well is producing around 9.5 MMSCFD
Badar-1 is on production since 2006 and has produced 69.76 BCF till April 2021
Badar-2 was drilled in 2014 and currently producing at the rate of 5.5 MMSCFD.
Badar-3 well is planned
Up-dip potential in Sui Upper Limestone
A Gas Collection Network of around 24.5 km has been established
Dehydration Plant at Badar Gas Field has been installed and commissioned