Badar Mining Lease
page-banner

Petroleum Exploration (Pvt.) Ltd

BADAR MINING LEASE

Introduction

License No: 151/PAK/2002
Location/Districts: Ghotki, Sukkur, Kashmor
Date of Grant: 13-03-2002
Area (Sq.Km): 129.65
Rules: 1949

Milestones Achieved And Key Features:

Petroleum System is fairly present in the region

Recoverable reserves of 124 BCF in Sui Main Limestone

Badar-1 was drilled in 1994. Currently the well is producing around 9.5 MMSCFD

Badar-1 is on production since 2006 and has produced 69.76 BCF till April 2021

Badar-2 was drilled in 2014 and currently producing at the rate of 5.5 MMSCFD.

Badar-3 well is planned

Up-dip potential in Sui Upper Limestone

A Gas Collection Network of around 24.5 km has been established

Dehydration Plant at Badar Gas Field has been installed and commissioned