Petroleum System

Source:

Sembar & Lower Goru (early Cretaceous) Shales

Reservoir:

Sui Main Limestone & Sui Upper Limestone Carbonates

Seal:

Ghazij (Eocene) & Shales

Introduction

License No: 327/PAK/2003
Location/Districts: Kashmor & Ghotki
Date of Grant: 20-12-2003
Area (Sq.Km): 200.22
Policy: 2001 (to be converted to 2012 policy)
Rules: 2001

Milestones Achieved and Key Features:

Mapping of a prospective structure at Sui Main Limestone level

Estimated reserves of 100 BCF

All planning activities have been completed for the drilling of Ibrahim-1well

Attractive economics with an NPV@10%of USD 110 million

Payback period of less than 6 months

Acquired 134 lkm 2D seismic

Interpreted 654 lkm 2D seismic and 3wells data

Block is surrounded by multiple gas fields which include Qadirpur 5.5 TCF, Khandkhot 1.6 TCF and Badar 134.5 BCF

A well developed gas infrastructure near the block

Potential of discovering good-quality gas, having 800-900 BTU/SCF

PEL has planned to drill a well as Ibrahim-1, shortly. Its location has already been marked and LLIs have been procured.